top of page

Special Flight Permits (Ferry Permits): The Two Paths, Forms 8130-6 and 8130-7, and How to Get One

Dec 17, 2025
12 min read

Updated: Sep 26

Not every aircraft that needs to be moved is fully airworthy. Sometimes an aircraft must be flown to a maintenance facility, storage location, or place of repair even when it no longer meets standard airworthiness requirements. In these situations, the FAA provides a legal solution known as a Special Flight Permit — commonly called a ferry permit. But there's more to it than "call the FSDO": there are two distinct regulatory paths, two different form numbers (one to apply, one that's issued), a choice between the FSDO and a DAR, and a specific process involving a maintenance statement. Understanding how special flight permits actually work helps owners and pilots move aircraft legally and safely, and it's a reliable checkride topic.


This post covers special flight permits in practical depth: what they are and the two regulatory paths, when they're needed (and when they won't be issued), the Form 8130-6 versus 8130-7 distinction, who issues them (FSDO versus DAR), the application process, the operating limitations, the continuous authorization for commercial operators, and pilot responsibilities.



Study this full length lesson (video, podcast, flashcards, and quiz) here: Full Length Lesson >


What a Special Flight Permit Is

A Special Flight Permit is an FAA authorization allowing an aircraft to be operated even though it doesn't meet all applicable airworthiness requirements — provided it can be flown safely for a specific purpose.


The key characteristics:

  • Authorizes operation of a non-airworthy aircraft

  • For a specific purpose and (usually) a specific route/flight

  • The aircraft must be capable of SAFE flight for the intended purpose

  • Issued under 14 CFR 21.197 (and the process in 21.199)


What it is (and isn't):

  • It's a limited authorization to fly a specific non-airworthy aircraft for a specific reason

  • It is a type of special airworthiness certificate (issued on Form 8130-7 — below)

  • It does NOT make the aircraft airworthy

  • It does NOT replace required maintenance/inspections


The "capable of safe flight" standard:

  • The aircraft must be able to fly SAFELY for the purpose

  • Not airworthy (doesn't meet all requirements), but safe for this specific flight

  • Safety is the threshold

  • The FAA (or DAR) judges this


The regulatory home:

  • 14 CFR 21.197: describes special flight permits and their purposes

  • 14 CFR 21.199: the application process (the form)

  • Together they govern ferry permits

  • Part 21 (certification procedures)


The Two Regulatory Paths

A distinction the basic treatment doesn't make: there are actually two paths under 21.197, and one has a special weight provision.


Path 1 — Standard special flight permit (21.197(a)):

  • For aircraft that don't currently meet airworthiness requirements but are capable of safe flight

  • The common ferry permit

  • Purposes: flying to repair/maintenance, delivery, storage, production testing, evacuation from danger, customer demo

  • The typical case (expired annual, overdue AD, etc.)


The 21.197(a) purposes:

  • Flying to a base where repairs/alterations/maintenance/inspection will be performed (or to storage)

  • Delivering or exporting the aircraft

  • Production flight testing

  • Evacuating from an area of impending danger

  • Customer demonstration flights (new production aircraft)


Path 2 — Ferry with excess weight for extended-range fuel (21.197(b)):

  • A special provision for operating at weights EXCEEDING the maximum certificated takeoff weight

  • For flights over water or over areas where landing isn't possible, requiring extra fuel

  • The aircraft carries extra fuel (exceeding max gross) to make the long ferry

  • A specialized permit (e.g., ferrying an aircraft across an ocean with ferry tanks)


Why the weight path exists:

  • Long overwater ferries (delivering an aircraft internationally) may require fuel beyond the normal max weight

  • This permit authorizes the over-weight operation for the ferry

  • With specific conditions and often specific pilot qualifications

  • A distinct, more involved permit


The practical distinction:

  • Most ferry permits are Path 1 (standard — the aircraft isn't airworthy but is safe)

  • Path 2 is for the specialized over-weight extended-range ferry

  • Different purposes, different conditions

  • Know both exist


Free mobile app ad with three smartphones showing aviation training screens: VOR trainer, study courses, and flight controls.
Study courses, lesson plans, teaching courses, endorsements, interactive trainers, audiobooks, flashcards, and more! Download it free here >

When a Special Flight Permit Is Needed

The qualifying situations, expanded.


A permit is needed when the aircraft is NOT airworthy but must be flown for:

  • Ferrying to a maintenance/repair facility (the most common)

  • Delivering or exporting the aircraft

  • Moving to storage

  • Production flight testing

  • Evacuating from impending danger (weather, natural disaster)

  • Customer demonstration (new aircraft)


The most common GA use — the expired annual:

  • An aircraft with an expired annual inspection is not airworthy

  • To fly it to a shop for the annual, you need a ferry permit

  • This is THE classic ferry-permit scenario

  • The annual lapsed, the aircraft must get to maintenance


Common qualifying conditions:

  • Expired annual inspection

  • Certain overdue Airworthiness Directives (if the aircraft is still safe to ferry)

  • Inoperative equipment not deferrable under an MEL or 91.213

  • Minor structural or cosmetic damage (that doesn't affect safe flight)

  • Engine or system limitations that still allow safe operation


The "not all conditions qualify" point:

  • A ferry permit is only for aircraft CAPABLE of safe flight

  • Serious safety issues don't qualify (below)

  • The condition must allow safe ferrying

  • Not every unairworthy aircraft can get a permit


When no permit is needed:

  • If the aircraft IS airworthy, no permit needed (just fly it)

  • If a regulatory exception applies (e.g., the 100-hour 10-hour overfly to reach a shop)

  • If the issue can be deferred (91.213 or MEL)

  • The permit is for when there's no other legal way to fly it


When a Permit Will NOT Be Issued

The safety limits, expanded.


The FAA/DAR will NOT issue a permit if:

  • The aircraft cannot be operated safely

  • There's unresolved structural damage affecting flight safety

  • Critical flight controls are compromised

  • The aircraft presents an unacceptable risk to people or property


The safety-not-convenience principle:

  • Eligibility is determined by SAFETY, not by the owner's need

  • A permit is issued only if the aircraft can fly safely for the purpose

  • No matter how badly the aircraft needs to be moved, if it can't fly safely, no permit

  • Safety is the gate


Examples of non-qualifying conditions:

  • Major structural damage (compromised airframe)

  • Flight control problems

  • Conditions that make safe flight impossible

  • Anything that would endanger the flight or people/property below


The alternative for non-qualifying aircraft:

  • If the aircraft can't fly safely, it must be transported another way

  • Disassembly and ground/sea transport

  • The permit isn't available for genuinely unsafe aircraft

  • Repair enough to be safe, or transport it


Forms 8130-6 and 8130-7: The Two Numbers

A form distinction worth clarifying, since two 8130 numbers are involved.


FAA Form 8130-6 (the APPLICATION):

  • "Application for U.S. Airworthiness Certificate"

  • This is the form you SUBMIT to APPLY for the special flight permit

  • Includes aircraft identification, the purpose, proposed route, limitations

  • The application document


FAA Form 8130-7 (the ISSUED certificate):

  • "Special Airworthiness Certificate"

  • This is the certificate ISSUED when the permit is granted

  • A special flight permit is a type of special airworthiness certificate, documented on 8130-7

  • The actual permit (carried in the aircraft)


The distinction:

  • 8130-6: apply (the application)

  • 8130-7: issued (the special airworthiness certificate / the permit itself)

  • You apply on 8130-6, you receive 8130-7

  • Two different forms in the process


Why this matters:

  • The 8130-7 (the special airworthiness certificate) is what's displayed/carried during the ferry

  • It's the authorization document

  • The 8130-6 was the application

  • Know which is which


Carrying the permit:

  • The special flight permit (8130-7) must be carried in the aircraft during the ferry

  • Along with the operating limitations

  • Available for inspection

  • The authorization for the flight


Who Issues Special Flight Permits: FSDO vs. DAR

The two issuing authorities and the practical difference.


The FAA Flight Standards District Office (FSDO):

  • The local FAA office can issue special flight permits

  • Free (no charge from the FAA)

  • May take longer (FAA workload, scheduling)

  • The traditional route


A Designated Airworthiness Representative (DAR):

  • A private individual authorized by the FAA to issue certain certificates, including special flight permits

  • Charges a FEE (private service)

  • Often FASTER than the FSDO

  • A convenient alternative


The practical choice:

  • FSDO: free but potentially slower

  • DAR: costs money but often quicker

  • For a time-sensitive ferry, a DAR may be worth the fee

  • Both are legitimate issuers


The DAR's value:

  • When you need the permit quickly (a time-sensitive move)

  • DARs can often turn it around faster

  • The fee buys speed and convenience

  • A common choice for owners in a hurry


The supporting documentation:

  • Either issuer may require supporting documentation

  • The maintenance statement (below), aircraft records, the proposed operation

  • Provided before approval

  • Part of the process



How to Obtain a Special Flight Permit

The process, expanded.


Step 1 — Determine eligibility:

  • A certificated mechanic evaluates the aircraft

  • Confirms it can be flown SAFELY for the intended purpose

  • Identifies the discrepancies and any needed precautions

  • The safety determination


Step 2 — The maintenance statement:

  • A mechanic (typically an A&P, and often an IA for the assessment) provides a written statement

  • Describing: the aircraft's condition, known discrepancies, and why it's safe for the intended flight

  • May specify operating limitations/precautions

  • The basis for the safe-flight determination


The maintenance-statement detail:

  • The statement establishes the aircraft is safe to ferry

  • It may list conditions (e.g., gear down, specific airspeed, day VFR)

  • The FAA/DAR relies on it

  • A key document


Step 3 — Submit the application:

  • The owner/operator submits Form 8130-6 (the application)

  • Includes: aircraft identification, purpose of flight, proposed route, requested operating limitations

  • To the FSDO or DAR

  • The formal request


Step 4 — FAA/DAR review and approval:

  • The issuer reviews the application and maintenance statement

  • If satisfied the aircraft can fly safely for the purpose, issues the permit (8130-7)

  • With specific operating limitations

  • The permit is granted


The timeline:

  • FSDO: can take days (workload dependent)

  • DAR: often faster (for a fee)

  • Plan ahead for a non-urgent ferry

  • Expedite via a DAR if urgent


Operating Limitations Under a Permit

The restrictions, expanded.


Typical limitations:

  • Day VFR only (common — no night, no IFR)

  • No passengers (except required crew)

  • Specific altitude or airspeed limits

  • Approved routing (a defined route)

  • Weather minimums (often higher than standard VFR)

  • One-time or time-limited authorization


Why these limitations:

  • The aircraft isn't fully airworthy, so the operation is restricted to reduce risk

  • Day VFR, no passengers, defined route: minimize exposure

  • The limitations make the ferry as safe as practical

  • Tailored to the aircraft's condition


The crew-only restriction:

  • Generally only required crew aboard (no passengers)

  • The flight is to move the aircraft, not to carry people

  • Minimizes people at risk

  • A standard limitation


The routing:

  • Often a specific route (to the maintenance facility)

  • Avoiding congested areas, over-flight of populated areas as practical

  • Defined in the permit

  • Must be followed


The strict-compliance requirement:

  • The pilot must comply with ALL limitations on the permit

  • Deviating from the limitations violates the permit (and airworthiness)

  • The limitations are conditions of the authorization

  • No deviation


Continuous Authorization for Commercial Operators

A provision the basic treatment doesn't mention: some operators hold a standing ferry authorization.


What it is:

  • Part 119 certificate holders (Part 121/135 operators) with an approved program

  • Can obtain a CONTINUOUS authorization for special flight permits

  • Allows them to issue their own ferry permits (within their program) without applying each time

  • For their fleet


Why it exists:

  • Airlines and large operators frequently need to ferry aircraft (maintenance, repositioning)

  • Applying for each permit would be impractical

  • The continuous authorization streamlines it

  • Built into their operations specifications


How it works:

  • The operator's program (approved by the FAA) authorizes ferry permits under defined conditions

  • They self-issue within the program

  • Documented per their procedures

  • Efficient for large fleets


The Part 91 contrast:

  • Part 91 (private) operators apply for each permit (FSDO or DAR)

  • No continuous authorization for typical Part 91

  • The continuous authorization is a commercial-operator feature

  • Know the distinction


Pilot Responsibilities

The PIC's role, expanded.


The PIC must:

  • Review and understand ALL permit limitations

  • Verify the aircraft's condition before flight

  • Ensure compliance with any required placards or procedures (from the maintenance statement)

  • Decline the flight if safety is questionable


The retained responsibility:

  • Even with a permit, the PIC retains FULL responsibility for flight safety

  • The permit authorizes the flight; the PIC decides to actually fly it

  • If the pilot judges it unsafe, decline

  • PIC authority is not diminished by the permit


The pre-flight verification:

  • Inspect the aircraft (given its known condition)

  • Confirm the discrepancies are as described (nothing worse)

  • Verify the required precautions are in place

  • A careful preflight


The decline option:

  • A permit doesn't obligate the pilot to fly

  • If the pilot has safety concerns, decline

  • The PIC's judgment governs

  • Legal to fly ≠ must fly


The qualifications:

  • The pilot should be qualified and comfortable with the ferry (often a non-normal operation)

  • Some ferries (e.g., over-weight, or a damaged aircraft) demand experience

  • Know your limits

  • Ferry flying can be demanding


Special Flight Permits and Insurance

The insurance consideration, expanded.


The coverage question:

  • Not all insurance policies automatically cover flights under a special flight permit

  • Ferrying a non-airworthy aircraft may be excluded or require notification

  • Confirm coverage BEFORE the flight

  • A critical check


Owner actions:

  • Notify the insurer before the ferry

  • Confirm coverage is in effect for the permit flight

  • Verify pilot qualification requirements (the insurer may require specific experience)

  • Get confirmation


Why it matters:

  • Flying without coverage exposes the owner and pilot to significant liability

  • A ferry of a non-airworthy aircraft carries elevated risk

  • Insurance gaps are a real danger

  • Confirm before flying


The pilot's interest:

  • The pilot should also confirm they're covered (as the operator)

  • Ferry flights may have specific requirements

  • Don't assume coverage

  • Verify


Common Misconceptions

  • "A ferry permit makes the aircraft airworthy."

    • No — it authorizes flight DESPITE the aircraft not being airworthy. It doesn't make it airworthy or replace maintenance.

  • "The permit replaces the required inspection/maintenance."

    • No — the aircraft still needs the repair/inspection. The permit just lets you fly it TO the maintenance.

  • "A ferry permit is good for multiple flights."

    • Generally no — it's for a specific flight or a defined operation. It's not a blanket multi-flight authorization (except the commercial continuous authorization).

  • "ATC approval can substitute for a special flight permit."

    • No — ATC clearance is not a special flight permit. You need the permit itself (from the FSDO or DAR).

  • "You apply and receive the same form."

    • You apply on Form 8130-6 (application) and receive Form 8130-7 (the special airworthiness certificate / permit). Two different forms.

  • "Any unairworthy aircraft can get a ferry permit."

    • No — only aircraft capable of SAFE flight for the purpose. Serious safety issues don't qualify.


Why Special Flight Permits Matter

The value, expanded.


They provide a legal pathway:

  • To move aircraft when normal operations aren't allowed

  • Prevent unnecessary disassembly or ground transport

  • Support efficient maintenance operations

  • Maintain regulatory oversight and safety standards


The efficiency benefit:

  • Instead of trucking an aircraft to a shop (disassembly, transport, reassembly)

  • Fly it there under a permit (if safe)

  • Faster and cheaper

  • Practical


The safety-preserved aspect:

  • The permit process ensures the aircraft is safe for the ferry (maintenance statement, limitations)

  • Regulatory oversight is maintained

  • Not a loophole — a controlled process

  • Safety is built in


The knowledge benefit:

  • Understanding permits helps owners and pilots avoid violations

  • Make informed decisions about moving aircraft

  • Know the process and the limits

  • Competence


Final Thoughts

Special flight permits are a vital part of the aviation regulatory system, allowing flexibility without compromising safety. Whether you're an aircraft owner coordinating maintenance or a pilot asked to ferry an aircraft, knowing the rules matters: the two regulatory paths (standard ferry and the over-weight extended-range ferry), the two forms (8130-6 to apply, 8130-7 as the issued permit), the choice between the FSDO (free, slower) and a DAR (fee, faster), the maintenance statement that establishes safe flight, and the operating limitations that must be strictly followed.


A ferry permit doesn't make an aircraft airworthy — it provides a controlled, legal way to fly a non-airworthy but safe aircraft for a specific purpose. Understanding how they work helps pilots and owners move aircraft legally and safely, and confirm insurance coverage before every ferry.


Hand holds skyTRX phone app showing flight path graphs against blue sky, with a plane and contrails and promo text.

On the Written Test and Checkride

Special flight permits appear on tests and checkride orals. The most commonly tested topics:

  • What a special flight permit is (21.197)

  • The qualifying purposes (ferry to maintenance, delivery, storage, evacuation, etc.)

  • That it doesn't make the aircraft airworthy

  • Who issues it (FSDO or DAR)

  • The operating limitations (day VFR, no passengers, etc.)

  • That ATC approval doesn't substitute for a permit


Quick Reference

Special Flight Permit (Ferry Permit):

  • FAA authorization to fly a NON-airworthy aircraft

  • For a specific purpose, capable of SAFE flight

  • 14 CFR 21.197 (permits), 21.199 (application)

  • A type of special airworthiness certificate


Two Regulatory Paths:

  • 21.197(a): standard ferry (not airworthy but safe) — the common case

  • 21.197(b): ferry EXCEEDING max takeoff weight for extended-range fuel (overwater delivery)


Qualifying Purposes:

  • Ferry to maintenance/repair/inspection (most common)

  • Delivery or export

  • Move to storage

  • Production flight testing

  • Evacuation from impending danger

  • Customer demonstration (new aircraft)


Common Situations:

  • Expired annual (the classic case)

  • Certain overdue ADs (if still safe)

  • Inoperative equipment not deferrable (MEL/91.213)

  • Minor damage not affecting safe flight


NOT Issued When:

  • The aircraft can't fly safely

  • Structural damage affecting safety

  • Compromised flight controls

  • Unacceptable risk to people/property


The Two Forms:

  • 8130-6: Application (submit to apply)

  • 8130-7: Special Airworthiness Certificate (the issued permit, carried in the aircraft)


Who Issues:

  • FSDO: free, potentially slower

  • DAR: fee, often faster


The Process:

  1. Mechanic evaluates (safe for the purpose?)

  2. Maintenance statement (condition, discrepancies, why safe)

  3. Submit Form 8130-6 (aircraft ID, purpose, route, limitations)

  4. FSDO/DAR review → issues permit (8130-7)


Typical Operating Limitations:

  • Day VFR only

  • No passengers (crew only)

  • Specific altitude/airspeed limits

  • Approved routing

  • Weather minimums

  • One-time/time-limited


Continuous Authorization:

  • Part 121/135 operators with an approved program

  • Self-issue ferry permits (no per-flight application)

  • Commercial-operator feature (not typical Part 91)


Pilot Responsibilities:

  • Understand all limitations

  • Verify aircraft condition

  • Comply with placards/procedures

  • Decline if unsafe (PIC retains full responsibility)


Insurance:

  • Coverage NOT automatic under a permit

  • Notify insurer, confirm coverage, verify pilot requirements before flying


Key Principle:

A special flight permit (21.197) authorizes flying a non-airworthy but safe aircraft for a specific purpose — most commonly ferrying to maintenance (e.g., an expired annual). You apply on Form 8130-6 and receive Form 8130-7 (the permit), issued by the FSDO (free) or a DAR (fee, faster), based on a mechanic's maintenance statement. It does NOT make the aircraft airworthy, comes with strict limitations (day VFR, no passengers), and ATC approval is no substitute.



Study Full Aviation Courses:

wifiCFI's full suite of aviation courses has everything you need to go from brand new to flight instructor and airline pilot! Check out any of the courses below for free:


Study Courses:


Checkride Lesson Plans:


Teaching Courses:



Author: Nathan Hodell

CFI, CFII, MEI, ATP, Creator and CEO

Nathan is an aviation enthusiast with thousands of hours of flying and dual instruction over the past 15+ years. Through his aviation career he has been able to earn his ATP, fly as an airline pilot, own/operate flight schools, and create and host wifiCFI.



 
 
bottom of page